CURRENT PROJECTS
Take a look at what we are doing and where we are in 2023!
LoVa Trail
Glenwood Springs, CO
This project is a 700 ft. extension to the LoVa Trail system. The long term goal of the LoVa Trail Association is to "create the LoVa Trail, a 47-mile, non-motorized recreation path along the river corridor from west Glenwood Springs to the Garfield County line near DeBeque".
Glenwood Springs Lift Station
Glenwood Springs, CO
The removal and replacement of the existing lift station
11,000 located approximately 500 feet northwest of the
Midland Avenue and East Meadows intersection, Glenwood Springs, CO 81601. The project consists of removal of the existing station and construction of the new station,
connection to the 16-inch force mains
Taylor Park Hydro
Taylor Park Reservoir, Gunnison, CO
Mueller Construction Services, Inc. (MCS) was recently awarded the contract to construct a Mini -Hydroelectric Plant at the base of Taylor Park Reservoir Dam in remote Gunnison County, at approximately 9,200 ft above sea level. The project starts in June 2023 and will run into 2024. Project consists of structural concrete, large diameter process pipe, buried pipeline, and millwright work.
Farmers Korner WWTP
Breckenridge, CO
The Work consists of furnishing labor and equipment for the installation of Owner procured Screw Press,
chemical feed pump, and screw conveyors; and supply and installation of associated piping, structural,
electrical, instrumentation and controls (I&C),
and miscellaneous improvements in the South Plant of the
FKWWTF.
Cortez Clarifier
Cortez, CO
The project includes removal and disposal of existing drive unit, and installation of a new drive unit on a 110’ diameter solid contact clarifier at the City of Cortez Water Treatment Plant